48-Hour Engineered Solution Prevents Costly Downtime
OVERVIEW
Facing unexpected downtime and desperate for a solution, the operators of this large chemical plant contacted Simtech on a Saturday for help completing a chemical double-containment system. We began manufacturing custom subassemblies on Sunday and had a technician along with all the required material on-site and advising on the installation just 48 hours later. As a result we saved this grateful customer $2.5 million in potential downtime costs.
CUSTOMER / LOCATION
Leading Chemical Manufacturer; DE